Image representing Panattoni Wakefield

Drainage

The image adjacent has been marked up to show the positions of the surface water drainage point of connection (blue circle), underground attenuation (blue rectangles) and foul water drainage point of connection (yellow circle). These are all located to the west of the development, away from the residential properties.

The drainage is designed so that the attenuation has capacity to store run-off up to a 1 in 100 year storm event plus 40% climate change event. Based on the latest designs, there is 3,437m³ of capacity in the attenuation being delivered as part of the development.

Image representing Panattoni Wakefield

Contact us

Please contact us by filling out the form

or contact

Mark Powell
Head of Project Management – Midlands and North

Email: [email protected]
M: +44 7375 619786
T: +44 207 513 0000

    Name:

    Email*:

    Address:

    Telephone:

    Please type your query in the box below: